Electronic signature for the French solar PV industry
From Enedis grid connection requests to EDF OA contracts, from Consuel certificates to collective self-consumption — Certyneo digitizes all administrative acts of the French solar photovoltaic industry. Compliant with Energy Code L.314-1, Decree 2017-676 (collective self-consumption), 2026 H2 Tariff Order, and eIDAS regulation for advanced signature. Multi-signers RGE QualiPV installer + owner + Enedis/EDF OA, 10-year archiving aligned with 20-year OA contract duration.
The administrative challenges of the French solar PV industry
A French photovoltaic project mobilizes up to 6 stakeholders (owner, RGE QualiPV installer, Enedis, EDF OA, Consuel, town hall) and 8 distinct administrative acts. Each signature delay costs 7-15 days on commissioning — and therefore on the start of the 20-year OA contract.
All French solar PV acts signable online
11 pre-framed acts with their legal framework and multi-signer flow.
Enedis / EDF OA mandates
Enedis connection mandate, EDF OA contract, self-consumption aid application. Multi-signers owner + RGE QualiPV installer.
RGE QualiPV certificate
Qualification certificate mandatory for French public aids and the 10% reduced VAT. Signed BEFORE the quote (eco-conditionality).
Consuel certificate
AC visa (self-consumption), Green (OA sale), Blue (residential). Mandatory for Enedis commissioning and OA contract start.
PV installation quote
Detailed quote with 10% VAT (residential ≤ 3 kWc) or 20%, French Consumer Code mentions, 14-day withdrawal period.
Collective self-consumption
PMO convention + participants within a 2 km radius (20 km in rural areas). Decree 2017-676. Multi-signers up to 100 participants.
Maintenance + transfer
Multi-year maintenance contract, 10-year compliance certificate, transfer deed with OA contract transfer (L.315-3).
Why French solar PV actors use Certyneo
Multi-party installer + owner + operator
Native multi-signer up to 100 participants for collective self-consumption. Individual SMS OTP per signer, qualified timestamping, SHA-256 hash per act.
Accepted by Enedis, EDF OA, Consuel
AES eIDAS accepted by Enedis Connect, EDF OA Solaire and the Consuel portal since 2019. 7-15 days faster than postal mail.
10-year archiving (extensible 20 years)
Legal archiving duration = 10 years. Contractual extension possible to cover the entire OA contract duration (20 years) + 5 years post-expiry. Accessible in one click.
All French solar PV cluster acts
11 specialized landings with legal FAQ and step-by-step HowTo.
PV mandate (pillar)
Central act covering connection, OA contract, Consuel, self-consumption aids.
Enedis connection mandate
Complete Enedis Connect procedure, up to 18 months.
EDF OA purchase contract
20 years, 2026 H2 tariff, total sale or surplus.
Consuel certificate
AC / Green / Blue visa depending on installation type.
RGE QualiPV certificate
Mandatory for aids + 10% VAT, signed BEFORE quote.
PV installation quote
Consumer Code L.121-21+, 14-day withdrawal period, mandatory mentions.
Collective self-consumption
PMO + participants convention, 2-20 km radius, Decree 2017-676.
Self-consumption aid mandate
Aid paid over 5 years with surplus OA contract, 2026 H2 Order.
PV compliance certificate
NF C 15-712-1 standard, DTU 65.13, basis for 10-year warranty.
PV maintenance contract
Annual visits, tacit renewal, Consumer Code art. L.215-1.
PV installation transfer
Automatic OA contract transfer (L.315-3) + Enedis connection.
Frequently asked questions — French solar PV
- Which French solar PV acts can be signed electronically?
- All of them: Enedis connection mandate, EDF OA purchase contract, Consuel certificate, RGE QualiPV certificate, installation quote, collective self-consumption convention, self-consumption aid mandate, compliance certificate, maintenance contract, transfer deed. All accepted with eIDAS AES advanced signature since 2019.
- What eIDAS level for the French solar PV industry?
- AES (advanced) recommended for all acts: SMS OTP, qualified timestamping, SHA-256 hash. Presumption of reliability under article 1367 of the French Civil Code. QES (qualified) not required for private deeds related to PV (except for notarized sales).
- How long does the EDF OA purchase contract last?
- 20 years since the 2017 Tariff Order (roof ≤ 100 kWc). Starts at the commissioning date certified by Consuel. Tariff guaranteed and indexed on IPP. At maturity, possible extension at market rate.
- What is the difference between total sale and self-consumption?
- Total sale = 100% of production sold to EDF OA, injection-only connection. Surplus sale = self-consumption + surplus resale, withdrawal + injection connection. Collective self-consumption (Decree 2017-676) = production shared among consumers within a 2 km radius (20 km in rural areas) via PMO.
- Are French solar PV aids cumulative?
- Self-consumption premium (surplus sale only) + CEE + eco-PTZ + 10% VAT (residential ≤ 3 kWc) are cumulative. No MaPrimeRénov' for residential PV since 2024. All require an RGE QualiPV installer — certificate signed BEFORE the quote (December 1, 2015 Order).