Electronic signature for French energy renovation
RGE contractors, administrative and financial delegates, Accompagnateurs Rénov' (MAR), ANAH operators (Soliha, Urbanis, CitéMétrie), CEE delegates — manage the entire energy-renovation contractual chain with compliant electronic signature. MaPrimeRénov' / ANAH / CEE / éco-PTZ mandates, RGE certificates, regulatory energy audits, construction quotes, third-party payer: all signed in 2 minutes, ANAH-accepted and admissible on audit.
Real blockers in the French energy-renovation journey
MaPrimeRénov' payment delays extended by incomplete or wrongly signed mandates. ANAH audits (5 years after payment) requiring production of the original mandate — lost by 30% of contractors. CEE cold-calling banned since the 24 July 2020 Act, requiring initial consent tracing. Tripartite RGE contractor + customer + delegate impossible to arrange on paper without a physical meeting. Certyneo solves these four blockers with mobile flow, individual SMS-OTP, and 10-year archiving with admissible eIDAS audit trail.
Every act of the energy-renovation journey
Six document families covering the entire journey, from quote to aid collection.
Aid mandates (MPR, ANAH, CEE, éco-PTZ)
Administrative and financial mandates letting an RGE contractor, broker or MAR file applications and collect aid on behalf of the beneficiary. Accepted by ANAH since 2021 at AES eIDAS level.
RGE contractor certificate
Certificate by which the contractor certifies their RGE qualification (Qualibat, Qualit'EnR, Cequami) to the customer and financer. Timestamped at quote date, admissible to certifying bodies on audit.
Regulatory energy audit
Mandatory diagnosis for selling F/G homes (Climate Act art. 158) and for MaPrimeRénov' Parcours accompagné. Signed by the RGE auditor and the owner, 10-year archiving.
Energy-renovation quote
Construction quote with mandatory mentions (SIRET, RGE, decennial warranty, HT/TTC prices), mobilisable aid and timestamped 14-day withdrawal. French Consumer Code L221-1+ compliant.
RGE contractor third-party payer
Tripartite contract customer + contractor + CEE obligated party, by which the CEE bonus is deducted directly from the quote. Accepted by all obligated parties since 2020.
Assignment of renovation aids
Assignment of claim (art. 1321 French Civil Code) letting a financial delegate become the holder of the right to collect aid in place of the beneficiary. Debtor notification included.
Why RGE contractors and delegates choose Certyneo
Mobile tripartite flow
Contractor + beneficiary + delegate or CEE obligated party in sequential or parallel signing. Each party signs from their phone with individual SMS-OTP. No physical meeting, no lost paper signatures.
Accepted by ANAH + CEE obligated parties
Compliant with the ANAH circular of 30 March 2021 (AES eIDAS mandates) and with main CEE obligated parties (TotalEnergies, EDF, Engie, Hellio, Effy). No blocker at processing-centre side.
10-year archiving + eIDAS audit trail
Mandate + proof PDF (identity, timestamp, hash, OTP, IP geolocation) archived 10 years, accessible in one click. Admissible in ANAH audit (5 years), CEE audit (6 years) and civil disputes.
Every act of the journey in electronic signature
Pillar + 10 key acts covering the entire French energy renovation.
Energy-renovation mandate (overview)
The pillar mandate: RGE contractor + beneficiary + administrative/financial delegate. Climate Act 2021-1104, eIDAS AES, 10-year archiving.
MaPrimeRénov' mandate
MaPrimeRénov' administrative and/or financial mandate. Decree 2020-26 + annual order. Accepted by ANAH since 2021 at AES level.
ANAH mandate (Habiter Mieux, Habiter Sain)
Mandate with approved operator Soliha, Urbanis, CitéMétrie. Construction Code L321-1+, ANAH agreement, AES eIDAS.
CEE mandate (Energy-Savings Certificates)
Mandate with obligated party (TotalEnergies, EDF, Engie) or delegate (Hellio, Effy). Energy Code L221-7+, 6-year CEE audit archiving.
MaPrimeAdapt' mandate (loss of autonomy)
Tripartite mandate AMO + senior/disabled beneficiary + contractor. Decree 2023-1411. AMO mandatory since 2024.
Éco-PTZ mandate (zero-interest loan)
Contractor + partner bank mandate (BNP, CA, SG, BP, CM). Art. 244 quater U French Tax Code, loan up to €50,000 over 20 years.
RGE contractor certificate
Qualibat / Qualit'EnR / Cequami certificate. Decree 2014-812. Timestamped at quote date, admissible on audit.
Regulatory energy audit
OPQIBI 1905 / Qualibat 8731 audit for F/G sale or MaPrimeRénov' Parcours accompagné. Climate Act art. 158, 5-year validity.
RGE contractor third-party payer (CEE)
Tripartite contract deducting CEE bonus from the quote. CEE Coup de pouce (2017 order). Anti-canvassing Act of 24 July 2020.
Assignment of renovation aids
Assignment of claim MaPrimeRénov' / CEE / éco-PTZ to a financial delegate. Art. 1321 French Civil Code, debtor notification included.
Energy-renovation quote
Construction quote compliant with French Consumer Code L221-1+. Timestamped 14-day withdrawal. SIRET, RGE, decennial warranty, mobilisable aid.
Frequently asked questions
- Can MaPrimeRénov' and ANAH mandates really be signed electronically?
- Yes — ANAH explicitly accepts mandates signed with eIDAS advanced signature (AES) since its 30 March 2021 circular, extended to MaPrimeAdapt' in January 2024. Advanced signature is the standard: identity verification by SMS-OTP, unique per-signer certificate, qualified timestamp. Article 1366 of the French Civil Code grants full probative force.
- How many signers does Certyneo handle in parallel?
- Up to 50 signers per envelope on all paid plans. For energy renovation, the typical flow is tripartite (RGE contractor + beneficiary + delegate) but can reach 5 signers in co-ownership (property manager + council) or Parcours accompagné (mandatory Mon Accompagnateur Rénov'). Sequential or parallel signing.
- How long are signed documents archived?
- 10 years included in all Certyneo plans, broadly covering regulatory requirements: 5-year ANAH audit (art. R321-23 French Construction Code), 6-year CEE audit (art. R221-1 French Energy Code), 10-year decennial construction warranty (art. 1792 French Civil Code), éco-PTZ loan duration up to 20 years. Beyond, archiving is free for Business and Enterprise accounts.
- Is the eIDAS audit trail admissible to ANAH or the CEE office?
- Yes — advanced signature benefits from the reliability presumption of article 1367 of the French Civil Code. In ANAH audits, the proof PDF (SMS-OTP identity + qualified timestamp + SHA-256 hash + IP geolocation) is accepted on the same footing as a paper mandate. Same for the national CEE office (Lyon) and DGCCRF.
- How much does electronic signature cost at Certyneo?
- Permanent free plan: 5 envelopes / month, multi-signers, AES eIDAS, 10-year archiving included — perfect for a solo contractor or a starting MAR. Pro plan at €9/month: 100 envelopes, company branding, API. Business plan for platforms (Effy, Hellio) with unlimited API and SSO. See /pricing for details.
To go further
Ready to digitise the entire energy-renovation journey?
Free plan to test, Business / Enterprise plans for platforms and ANAH operators. Free onboarding for RGE contractors and MARs.