A Site Safety Coordination Plan (sometimes called a contractor safety plan, host-contractor safety agreement, or multi-employer worksite safety plan) is the document a host employer and one or more contractors put together before contract work begins on a shared site. Its purpose is to identify hazards that arise specifically because two or more employers are working in the same space at the same time — the kind of interference risk that neither company would face working alone. Typical situations include a facility owner bringing in contractors for maintenance, construction, installation, or repair work; a general contractor coordinating multiple subcontractors on a job site; or a manufacturing plant hosting outside technicians who will work near its own employees and equipment. When to use it: this template is appropriate any time contractor personnel will be physically present and working on a site operated by another company, especially where the work involves elevated risk (confined spaces, hot work, working at height, energized equipment, heavy machinery, or excavation) or will run long enough that hazards are likely to evolve. There is no single federal statute that mandates a written document with this exact name for every job, unlike some other countries' regimes. Instead, U.S. obligations are built from a combination of sources: the Occupational Safety and Health Act's General Duty Clause (29 U.S.C. § 654(a)(1)), which requires every employer to furnish a workplace free from recognized hazards; OSHA's multi-employer worksite doctrine (described in OSHA Directive CPL 02-00-124), under which a host employer, a controlling employer, a correcting employer, and an exposing employer can each carry independent citation exposure for the same hazard; and hazard-specific standards that do impose written coordination duties, most notably 29 CFR 1910.146 (permit-required confined spaces, which requires host and entry employers to exchange hazard information), 29 CFR 1926.16 (allocation of duties among contractors on construction sites), and OSHA's process safety management standard, 29 CFR 1910.119(h), for contractors at covered facilities. Many state OSHA plans and individual facility insurance carriers also require a written plan as a condition of site access, so always confirm what your specific site, industry, or contract already requires before relying solely on general duty obligations. Parties: the host employer (the company that controls or operates the site where the work takes place) and the contractor or contractors (the outside company or companies whose personnel will perform work on that site). On larger jobs, a controlling employer or general contractor role may sit between the two, with its own coordination duties toward every subcontractor on site. Recommended preliminary step: before finalizing the plan, representatives of the host and the contractor should walk the site together to identify hazards that arise from the interaction of their respective equipment, materials, and activities — not just each company's own standalone hazards. This joint walkthrough is where most of the substance of the plan actually gets written; a plan drafted without it tends to be generic and misses site-specific risks. Typical content: the phases of work considered hazardous and the specific controls used for each, how equipment and installations will be adapted to the nature of the work, the emergency response and first-aid arrangements in place, the instructions given to workers of both companies (including who has stop-work authority), and how overall supervision and communication between the companies will be organized for the duration of the work. Common mistakes to avoid: skipping the joint site walkthrough and filling in a generic plan from a template without adapting it to actual site conditions; treating the plan as satisfying every applicable requirement without checking hazard-specific OSHA standards, state-plan rules, or contractual/insurance requirements that may impose additional or different obligations; failing to name a single point of contact from each company for real-time safety issues; and not updating the plan when the scope of work, personnel count, or site conditions change materially during the job.
Host employer name (company operating the site)
Address of the site
Contractor name (company performing the work)
Description of the work to be performed
Estimated duration of the work
Expected number of contractor personnel on site
Date of the joint site walkthrough
Recommended before finalizing the plan, so hazards specific to this site and this scope of work are actually identified.
Interference hazards identified during the walkthrough
Control measures and safeguards to be implemented
Emergency response and first-aid arrangements
Host employer's on-site safety point of contact
Contractor's on-site safety point of contact
Work start date
Does the work involve a permit-required confined space?
Date the plan is signed
Recommended before finalizing the plan, so hazards specific to this site and this scope of work are actually identified.