An equipment installation agreement is the contract used when a supplier or contractor agrees to deliver and/or install equipment — industrial machinery, technical systems, or production equipment — at a customer's facility in exchange for payment. Unlike a plain sale of goods, it typically combines a supply obligation (the equipment itself, governed in most U.S. states by Article 2 of the Uniform Commercial Code as adopted in that state) with a services obligation (assembly, calibration, commissioning), which is generally treated as a services contract under state common law rather than the UCC. Because many installation projects blend both elements, courts often apply a "predominant purpose" test to decide which body of law governs a dispute, so a well-drafted agreement should not assume UCC warranty rules automatically cover the installation labor. When to use it: any time a business is having equipment installed on its premises by an outside supplier or contractor — for a new capital investment, replacement of aging equipment, or a facility upgrade needed to meet operational or code requirements. This template works for both new equipment and retrofits or replacements of existing systems, and is written for general use across U.S. states rather than for one specific jurisdiction; state-specific requirements (mechanic's lien notices, sales and use tax treatment, contractor licensing) should be layered in based on where the installation takes place. Parties: the contractor (or supplier-installer) providing and installing the equipment, and the customer (the business receiving the installation). Both parties should be identified by full legal name, business entity type, and principal address, with signing authority confirmed for whoever executes the agreement. Key clauses: a precise description of the equipment and its technical specifications (make, model, capacity, applicable industry standards); an installation schedule with milestones; the customer's pre-installation obligations (site preparation, power and utility connections, access, permits); the price and payment terms (deposit, progress payments, final payment on acceptance); the acceptance procedure (commissioning tests, punch list, signed acceptance certificate); the warranty terms — distinguishing the manufacturer's warranty on the equipment from the contractor's warranty on workmanship; risk of loss and insurance during transport and installation; limitation of liability; user training where applicable; confidentiality if proprietary processes are involved; and termination rights, including what happens to work in progress and payments already made if either party terminates early. Common mistakes to avoid: failing to separate the equipment manufacturer's warranty from the installer's warranty on labor, which leaves ambiguity about who is responsible when something fails; omitting the customer's pre-installation obligations, which is one of the most common causes of installation delays and disputes over who caused them; skipping a formal acceptance procedure with commissioning tests and a signed acceptance certificate, which makes it hard to pin down when the warranty period starts and when final payment is due; not addressing risk of loss and insurance coverage while equipment is in transit or being installed; and neglecting to specify remedies for late delivery or late completion, such as liquidated damages or a right to terminate after a defined cure period. Depending on the project value and the state where installation occurs, contractors may also need to comply with contractor licensing rules and, for projects involving real property improvements, mechanic's lien notice requirements — those obligations are jurisdiction-specific and are not covered by this general template. This template is a drafting starting point; it should be adapted to the specific equipment involved and reviewed by a licensed attorney for complex, high-value, or heavily regulated installations.
Contractor / supplier legal name
Contractor entity type (e.g., LLC, Corporation)
Contractor address
Customer legal name
Customer entity type (e.g., LLC, Corporation)
Customer address / installation site
Effective date of agreement
Description of equipment and technical specifications
Installation site address (if different from customer address)
Planned installation start date
Target installation completion date
Total contract price
Currency
Deposit amount due on signing
Includes milestone/progress payments
Final payment terms (e.g., due on acceptance, net 30)
Customer's pre-installation obligations
Contractor's workmanship warranty period (months)
Separate manufacturer warranty applies to the equipment
Includes user training
Training details (scope, duration, location)
Late completion / liquidated damages terms
Governing state law
Limitation of liability cap (e.g., contract price)
Termination notice period (days)
Confidentiality clause required