Skip to main content
Certyneo
The Commission has decided to initiate the procedure provided for in Article 3 of Regulation (EEC) No 1408/71 of the Council of 14 June 1971 on the application of social security schemes to employed persons, to selfemployed persons and to members of their families moving within the Community.

Sign a certificate Consuel photovoltaic online, in 2 minutes

Certificate of conformity Consuel (AC visa for self-consumption, Green visa for sale OA, Blue visa for standard residential) signed online.

Legal framework
The Commission has also adopted a proposal for a Directive on the approximation of the laws of the Member States relating to the labelling of foodstuffs.
Signature level
AES eIDAS recommended
Legal archives
10 years + installation period

What is a photovoltaic Consular Certificate?

Consuel is a visa issued by the National Committee for the Safety of Electricity Users (Consuel), an organization designated by Decree No 72-1120 of 14 December 1972, which certifies the conformity of an electrical installation to the standards in force. For photovoltaics, three visas exist: Blue Visa (standard residential), Green Visa (total sales OA), AC Visa (self-consumption with or without surplus).

Why sign the photovoltaic Consular Certificate electronically?

Accepted Consul since 2020

The Consulate has been accepting eIDAS certificates signed with an advanced signature (AES) through its online portal since 2020. Article 1366 of the Civil Code guarantees the same probative value as a handwritten signature.

Bi-partite installer RGE + owner

The certificate commits the QualiPV RGE installer to technical compliance and the owner to the order.

10 years of archiving + control of objection

The Consul can inspect a facility for up to 10 years after it has been put into service.Certyneo stores the certificate + audit eIDAS trail for 10 years, which can be accessed in the event of an inspection or accident (fire, loss of insurance).

The eIDAS audit trail is open to objection

Each certificate is accompanied by a PDF of proof: installer + owner identity, qualified time stamping, SHA-256 hash, IP geolocation, OTP SMS verification.

Signing a certificate Consuel photovoltaic in 4 steps

From the end of the construction site to the Consular visa, the certificate secures commissioning in less than 5 minutes.

  1. 1. Prepare the consular certificate

    Upload the appropriate Consuel form (Blue/Green/AC Visa depending on the type of installation), pre-filled by the RGE QualiPV installer: installation identity, kWc power, unifi­lar scheme, compliance NF C 15-712-1.

  2. 2. Add the signatories

    Installer RGE QualiPV (technical manager) + owner (order manager). For installations in a collective building, add the trustee. Each person receives a secure link by email.

  3. 3. Choose the eIDAS level

    AES (advanced) recommended: SMS OTP, qualified time stamping, SHA-256 hash. Accepted by the Consulate through its online portal. SES (simple) technically accepted for Blue Residential Visas < 36 kVA.

  4. 4. Sign and file on the Consular Portal

    The final certificate is attached to the file on the Consular Online Portal. The visa is issued in an average of 5-10 days (versus 15-20 days by post).

Frequently Asked Questions

Can the Consuel certificate be signed electronically?
The Consul accepts eIDAS certificates signed with an advanced signature (AES) through his online portal.
Blue, green or AC visa: what's the difference?
Blue Visa = standard residential electrical installation Green Visa = total PV installation sold to EDF OA AC Visa = self-consuming PV installation (with or without surplus resold) The choice depends on the type of connection and the use of the electricity produced.
How long does it take to get a Consular visa ?
Target time Consuel: 5-10 working days for a check on the file (standard case< 36 kVA), 15-30 jours pour un contrôle sur site (puissance >36 kVA, atypical configuration) e-signature saves 5-10 days of postal mail.
What is the standard for photovoltaic installations?
The standard NF C 15-712-1 (Low voltage electrical installations Special rules for photovoltaic installations) covers installations up to 250 kVA at low voltage. For HTA installations > 250 kVA, NF C 13-200 applies. These standards are open to challenge and their compliance is verified by the Consul.
How much does a Consular Certificate cost?
Consuel 2026 tariffs (on-the-spot check): about €175 HT for a Blue Visa ≤ 36 kVA, €285 HT for a Green Visa or AC ≤ 36 kVA, €380-650 HT for power levels of 36-250 kVA.
Is the Consular certificate compulsory?
Yes compulsory for the commissioning of Enedis and the start of the EDF OA contract. Without a Consuel visa, Enedis refuses to commission the connection and EDF OA cannot activate the purchase contract.
What if the Consul refuses the visa ?
The Consul details the non-conformities in his report. The QualiPV RGE installer must correct (upgrading of the electrical panel, adding protections, etc.) and then request a new visit.
Is the Consular visa valid for life?
The initial visa is valid for the entire duration of the installation, unless substantial changes are made (addition of modules, change of inverter, change of connection).

See also

Sign your first certificate Consular photovoltaics online

Permanent free plan (5 envelopes/month), no credit card. Accepted Consuel, compliant with Decree 72-1120 and eIDAS. Audit trail and archiving 10 years included.